Executive alignment investigation

Fix the system. Not the pilot.

We investigate why capable leadership teams keep producing results they did not intend. You get a written finding at the end of it, not another framework.

12–16 weeks Fixed scope Written finding

Book a call Or take the four-minute diagnostic

Your five defencesIllustrative
Where they line up One place with nothing left to stop it.

01 / When to call us

Three signs the problem is structural.

If one of these describes your business, the cause is unlikely to be the people you have been changing.

01Sign

It keeps coming back

You have restructured the same area more than twice and the problem returned each time. If changing the structure were the fix, it would have worked on the first attempt.

02Sign

Agreement does not survive the room

The minutes say the decision was unanimous. What actually gets funded afterwards says something else.

03Sign

The reports did not change anything

You already hold good analysis. The recommendations were written before the diagnosis was finished, so the underlying problem is still there.

Recognise one of those? The first call costs nothing.

Book a call 90 minutes · Written outcome

An accident does not begin when something goes wrong. It begins when the system stops being able to see itself.

Applied from ICAO Annex 13, the international standard for air accident investigation.

02 / How we investigate

Four phases. The same four, every time.

The four phases are the same in every engagement. That is what lets us tell you how your business compares with the others we have examined, rather than just describing it.

01Weeks 1–2

Preserve the scene

We collect the evidence already sitting in your business before anything moves: board packs, minutes, exit interviews, the org chart and the one people actually use.

02Weeks 2–6

Listen properly

One-to-one sessions across the leadership team and the layer below. Nothing is attributed to anyone. We record what people actually say, word for word.

03Weeks 5–9

Trace the cause

A dated timeline of decisions, followed back four levels past the symptom. A failure like this usually rests on 7 to 12 small factors rather than one big one.

04Weeks 8–12

Score the defences

Strategy, communication, trust, accountability and escalation, each scored from the evidence. The finding is the place where all five have a gap at once.

See the whole process

03 / How we fix it

The FRANK Method®

Find out what is really happening. Then fix what is causing it. An investigation with no intervention is an expensive document. An intervention with no investigation is a guess.

FFrame

Frame the reality

We put the facts and the evidence in front of the team as one shared picture, so the conversation afterwards has somewhere solid to stand.

RReflect

Reflect on alignment

We check whether what the team actually did matches what it agreed to do. The question is what the system was missing, not who is at fault.

AArticulate

Articulate the impact

We put a number on it: delay, rework, replacement costs, slow decisions, penalty exposure. A board can act on a finding it can price.

NName

Name the adjustments

We agree exactly what changes, who owns each change, and how anyone outside the room could tell it was done.

KKickstart

Kickstart realignment

Twelve weeks of putting the changes into practice, tracked against the register, with our support withdrawn on a schedule you can see in advance.

04 / Where the method comes from

Six disciplines. None of them from management consulting.

Principal sources: ICAO Annex 13; Reason (1990); Endsley (1988); Dekker on restorative just culture.
DisciplineFieldWhat it gives us
ICAO Annex 13Civil aviationHow to trace a chain of causes, with blame formally kept out of the terms of reference
Swiss cheese modelHuman factorsHow to map weaknesses across several defences and find where the gaps line up
Situational awarenessHuman factorsHow to separate what a team saw, what it understood and what it expected next
Restorative just cultureSafety scienceHow to keep people talking once the uncomfortable findings are on the table
Crew resource managementFlight deck trainingHow to measure whether junior people can safely challenge senior ones
Failure Mode and Effects Analysis (FMEA)Reliability engineeringHow to score what is left over, by severity, likelihood and how easily it is spotted

05 / What you get

Four documents, and one you keep using.

D1Week 1

Preliminary report

A written position on three things: whether this looks like an alignment problem, what an investigation would examine, and what it would cost. Where we conclude that an investigation is not warranted, the report says so in the first paragraph and there is nothing further to pay or decide.

D2Weeks 10–14

Findings report

Numbered findings, one to a page, each carrying the pattern, the evidence and the consequence together. How many people we heard it from is in the sentence.

D3Weeks 12–16

Alignment register

Every change scored, owned by one named person and given a completion test somebody outside could verify. This is the one your board keeps.

D4+12 weeks

Embedding protocol

A published schedule for withdrawing our support, with the register re-scored at each step so you can see whether the fixes are holding.

Specimen · alignment register

RefChangeOwner Sev. Det. Status
A-01Decision rights restated for capital spend above thresholdChief Financial Officer87OpenMonitoring
A-02Escalation route published, with a stated time to respondChief Operating Officer79Open
A-03Minutes record dissent by function rather than by nameCompany Secretary54Monitoring
A-04Incident reviews separated from performance reviewsChief People Officer68Closed
A-05Escalation on capital variance routed through the Chief Financial Officer's own officeChief Financial Officer92Open

Specimen only. The figures are made up and describe no client.

Severity and detectability are each scored 1 to 10. Severity is how bad the impact would be if the gap stays open. Detectability is how easily anyone outside would notice that it exists.

A-01 Severity 8 · detectability 7
Serious, and visible enough that people keep raising it. That is why it moves between open and monitoring instead of settling.
A-02 Severity 7 · detectability 9
The easiest one here to see, and nearly as serious as A-01. It has stayed open regardless, which is the reason for scoring it.
A-03 Severity 5 · detectability 4
The mildest of the five. It sits in monitoring rather than being escalated.
A-04 Severity 6 · detectability 8
Moderate and easy to see, which is usually why this kind gets closed first.
A-05 Severity 9 · detectability 2
The blind spot. The worst impact in the register and the hardest to see, because the person who would normally raise it is the same person the escalation runs through.

06 / What it costs

Priced against the person you would otherwise hire.

We do not quote a day rate. You are buying a finding, not a number of days.

Start hereNo fee

Preliminary report

90 minutes with the executive who would sponsor the work, and a written position at the end of it.

01From US$35,000

Black box review

The full investigation and the intervention that closes it. Priced by how many defences are in scope, not by hours.

02By scope

Realignment

The fix on its own, where a sound investigation already exists and the business has not been able to act on it.

03Retained

Register oversight

Quarterly re-scoring reported straight to the board, independently of the executives it measures.

See the full pricing logic

07 / The decision

Two things can happen. One of them is happening already.

If nothing changes

The problem continues

  • You restructure the same area a third time
  • Decisions keep getting made on a version of the business that was tidied on the way up
  • People leave, are replaced, and the replacements meet the same conditions
  • You automate on top of the record exactly as it stands
After the investigation

You can see it

  • A dated chain of cause your executive team can look at together
  • Five defences scored, and the exact place where the gaps line up
  • Changes with named owners and tests anyone could verify
  • A register your board can re-score without us in the room